Blower balloon
BSA asked us to develop a bladder pump that can easily inflate balloons without electricity. Through a composition of plastic tubes mounted on a base we got this done. Inside there are several rubber valves that regulate the airflow.
Furniture stand Ecohuis
For Ecohuis we were asked to build iPad holders. Commissioned by VDS, we made cabinets all around in mitre. These sleek white elements were given a frame in the front that contained an iPad. The frame was hollow to pass the data cables.
Coffee Furniture MIKO
For MIKO, we were allowed to carry out a coffee unit in the offices of Eneco Mechelen. Commissioned by A & B Project we worked out the drawings into a sleek furniture.
Milling letters pattinating
For Cosentino we made a logo for A & B Project. This logo had to be patinated to make it rusty.
Support stairs
For WOW Toilets we made support legs for a staircase. These were aluminium rods in which wire was tapped so that the staircase can be placed on any surface.
Creation of Dallmer displays
Commissioned by A & B Project, we built two displays for Dallmer’s stand at Interieur 2018. This explained the placement of the shower drain. This was precision work to build it in MDF as all corners were slanted. The end result was a display in which the drain was seamlessly inserted.
Decorating trolley’s coffee maker
Smithy – Imex asked to make foam inserts for the transport of a coffee machine and glass jugs. This had to be done in an existing trolley. We emptied the inside and then cut the inserts to fit as many goods as possible.